Stealthing the Adani shell company: Key dates for Carmichael Rail Network Pty Ltd

The public record shows us that four years ago Adani began negotiating with local councils under the corporate banner of Carmichael Rail Network Pty Ltd (CRN) for the purposes of developing their Galilee Basin coal complex businesses. But it wasn’t until March of 2018 that Adani formally advised the Queensland Coordinator General (CG) of the change of name of the proponent for the North Galilee Basin Rail Project (NGBR) from Adani Mining Pty Ltd to Carmichael Rail Network Pty Ltd, and the addition of Carmichael Rail Network Pty Ltd as the rail proponent for the Carmichael Coal Mine and Rail Project (CCMR).

I was prompted to prepare a log of key dates and the primary sources that confirm them when I discovered an RTI (Right to Information) disclosure made to Lock the Gate Alliance (LGTA) in July 2019. The disclosure related to the North Galilee Water Scheme (NGWS) application by Adani and contains the revelation that Adani regarded Carmichael Rail Network Pty Ltd as the proponent for the rail component of both the North Galilee Basin Rail Project and the Carmichael Coal Mine and Rail Project more than a year before they informed the Coordinator General of the change of proponent. Crucially the disclosure shows that the Queensland government were informed, on the eve of the senate estimates hearings into the Northern Australia Infrastructure Facility (NAIF), that Adani were running a new rail proponent. The release of the LGTA disclosure was made more than 2 years after the original RTI application, this time frame strongly suggests that LGTA made at least 2 appeals before achieving success.

Under the act that governs the functioning of the Department of State Development, Manufacturing, Infrastructure and Planning (DSDMIP) the Coordinator General can, in writing, permit a proponent to delay reporting a change of proponent details for an unspecified period. It is likely that at some point in late 2016 Adani requested written advice from the CG indicating that they had unlimited time to inform them of a change of proponent. My understanding of the relevant act, the State Development and Public Works Organisation Act 1971 (SDPWO Act), is limited, but it is plain to see that it confers extraordinary, and unprecedented powers and privileges for large scale and controversial mining developments. This makes interpretation of Adani’s actions, sanctioned by the Coordinator General, extremely difficult to analyse. I would argue that the various NGOs and think tanks networked with the Stop Adani Alliance and the Climate Action Network Australia (CANA) collectively possess the capacity to apply knowledge of the SDPWO Act to good effect. What remains to be done is to follow up previous RTI applications with targeted applications using the terms “Carmichael Rail Network” and “ Carmichael Rail Network Pty Ltd”.

It is clear that federal Liberal National Party (LNP) politicians were aware that Adani was running a secret proponent and it is clear Queensland Labor politicians were aware that Adani was running a secret proponent. Both parties had access to commercial in confidence information about the NAIF loan applicant. My question is why were Larissa Waters and members of the Stop Adani Alliance confident that they knew the name of the secret proponent? The crucial primary sources supporting the claims made in this document from Environmental Justice Australia (EJA), and this, and this article by Stephen Long are not available online. The first specific contention made by EJA and Stephen Long in the lead up to senate estimates hearings was that the Adani loan applicant was one of a group of shell companies which included Carmichael Rail Network Pty Ltd whose holding companies were housed in the Cayman Islands. The second contention was that Carmichael Rail Network Pty Ltd was the holder of the royalty deed. In the absence of primary sources, these claims, supported by people like Adam Walters – principal researcher and Energy Resource Insights, and associate professor Thomas Clarke – director of the Centre for Corporate Governance at UTS do not form a compelling case identifying which Adani entity was applying for the NAIF loan.

In a written question on notice to Matt Canavan’s portfolio in March 2017 Larissa Waters asserted that “the company that owns their proposal for the railway line is ultimately owned in the Cayman Islands”. The confidence shown by Larissa Waters in asserting that she knows which Adani entity was the NAIF loan applicant was not supported by publicly available documents or evidence that those documents exist. Either Larissa Waters’ confidence came from her belief in the voracity of the claims made by Stephen Long and EJA, or it came from knowing that Adani had communicated to the Queensland government 2 months earlier that they were running a different proponent to the one listed on the DSDMIP website. It’s quite possible that the rumour mill provided Larissa Waters knowledge of Adani’s statements to the Queensland government. Was the existence of Adani’s secret proponent an open secret?

As far as I can tell, not a single RTI application in Queensland contains the words “Carmichael Rail Network” or “Carmichael Rail Network Pty Ltd”. Only 2 RTI disclosures mention Carmichael Rail Network Pty Ltd. The Greens and StopAdani Alliance members were very concerned about the specific Adani proponent in line for the NAIF loan, but once the NAIF loan was vetoed that concern evaporated. There is little to no evidence that any Greens politician, Stop Adani Alliance member or CANA member have made any effort to analyse or reveal the nature and function of Carmichael Rail Network Pty Ltd.

Unpacking the part played by the Queensland and federal governments in masking the establishment of a new proponent necessarily requires the unpacking of the North Galilee Basin Rail Project and Separable Portion 1 (SP1) (the remnants of the rail line proposed for the Carmichael mine). As I have demonstrated repeatedly in my blog, the Greens, StopAdani Alliance and CANA have no interest in unpacking the rail corridor and the deals done to establish Traditional Owner consent.

Background from my blog

‘References to NGBR in reports by environmental organisations about the NAIF concessional loan to Adani: Briefing Document’

https://wesuspectsilence.wordpress.com/2017/09/01/references-to-ngbr-in-reports-by-environmental-organisations-about-the-naif-concessional-loan-to-adani-briefing-document/

Confirmation that the North Galilee Basin Rail Project is the Adani rail project being considered by the Northern Australia Infrastructure Facility

https://wesuspectsilence.wordpress.com/2017/09/08/confirmation-that-the-north-galilee-basin-rail-project-is-the-adani-rail-project-being-considered-by-the-north-australia-infrastructure-facility/

Unpacking the Galilee Basin shell game

https://wesuspectsilence.wordpress.com/2017/12/24/unpacking-the-galilee-basin-shell-game/

Parties to the Galilee Basin shell game: The Greens

https://wesuspectsilence.wordpress.com/2017/12/28/parties-to-the-galilee-basin-shell-game-the-greens/

Plan B, Separable Portion 1 and the new Adani proponent

https://wesuspectsilence.wordpress.com/2018/10/01/plan-b-separable-portion-1-and-the-new-adani-proponent/

Briefing: Adani’s Plan B rail corridor

https://wesuspectsilence.wordpress.com/2019/06/12/briefing-adanis-plan-b-rail-corridor/

Key terms

Carmichael Rail Network Pty Ltd (CRN)

Queensland Coordinator General (CG)

North Galilee Basin Rail Project (NGBR)

Carmichael Coal Mine and Rail Project (CCMR)

Right to Information (RTI)

Lock the Gate Alliance (LGTA)

North Galilee Water Scheme (NGWS)

Northern Australia Infrastructure Facility (NAIF)

Department of State Development, Manufacturing, Infrastructure and Planning (DSDMIP)

State Development and Public Works Organisation Act 1971 (SDPWO Act)

Climate Action Network Australia (CANA)

Liberal National Party (LNP)

Environmental Justice Australia (EJA)

Separable Portion 1 (SP1)

 

21 key dates

The following is a list of 21 dates that represent the advancement of Adani’s spearhead contribution to the creation of the Galilee Basin coal complex. Very few of the sources and links have been cited by The Guardian Australia, Fairfax, ABC or NewsCorp journalists, even less has been shared by the Greens, StopAdani Alliance or Climate Action Network Australia members. I have included screen grabs whenever possible and have captured the text from each to demonstrate that the source documents are authentic.

Date: Jan 27, 2016

Source: Whitsunday RC minutes

Subject: Material change of use for rail infrastructure

12.7 2016/01/27.23 20150644 – REFERRAL ENTITY RESPONSE –

STATE DEVELOPMENT AREA APPLICATION

FOR MATERIAL CHANGE OF USE FOR RAIL

INFRASTRUCTURE (RAIL PACKAGE 4) IN

THE GALILEE BASIN STATE DEVELOPMENT

AREA, CARMICHAEL RAIL NETWORK PTY

LTD

screenshot.1307

https://www.whitsunday.qld.gov.au/DocumentCenter/View/1999

Date: May 11, 2016

Source: Whitsunday RC minutes

Subject: Material change of use for rail infrastructure

12.1 2016/05/11.11 20150643 – REFERRAL ENTITY RESPONSE – APPLICATION FOR MATERIAL CHANGE OF USE FOR RAIL INFRASTRUCTURE (RAIL PACKAGE 3) IN THE GALILEE BASIN STATE DEVELOPMENT AREA, CARMICHAEL RAIL NETWORK PTY LTD

screenshot.1308

https://www.whitsunday.qld.gov.au/DocumentCenter/View/2327

Date: January 10, 2017

Source: RTI Disclosure 16-417 (A), DNRME

Subject: CRN listed in Adani water licence application

Due to the size of the Project, Adani Mining has progressed the assessment for much of the rail, and

the Port, separately to the CCP. The entire rail line from the mine to the Port of Abbot Point will be

approximately 388 kilometres (km) long, known as the Carmichael Rail Network (CRN). The

proponent for the CRN is the Carmichael Rail Network Pty Ltd as trustee for the Carmichael Rail

Network Trust.

screenshot.1306

https://www.dnrme.qld.gov.au/__data/assets/pdf_file/0010/1448461/16-417_A.pdf

Date: May 15, 2017

Source: DTMR rail safety correspondence and Rail Regulator’s Report

Subject: Rail transport operator accreditation

I can advise that the Adani rail transport operator accreditation was surrendered by Adani Mining Pty Ltd when the CRN entity was granted accreditation.

[ ]

Greg Robertson, A/Senior Manager (Rail Safety Policy) | Road and Rail Safety
Land Transport Safety | Customer Services, Safety and Regulation Division | Department of Transport and Main Roads

screenshot.1309

‘Rail Regulator’s Report 2016–17: A report on safety performance on the rail network in Queensland’. ‘Appendix 1: Accredited Rail Transport Operators as at 30 June 2017’.

screenshot.1304

https://www.tmr.qld.gov.au/Safety/Rail-safety/Rail-regulator-yearly-report

Date: June 6, 2017

Source: Daily Mercury – John McCarthy

Subject: AECOM contract

Mr Janakaraj announced a further contract for the Carmichael Rail Network linking Galilee Basin mines to Abbot Point.

screenshot.1334

https://www.dailymercury.com.au/news/breaking-adani-given-green-light-for-16b-megamine/3186322/

Date: Sept 8, 2017

Source: ASIC extract

Subject: CRN ultimate holding company change from Caymans to Mauritius

08/09/2017 484 Change To Company

Details

484D Change To

Ultimate Holding

Company

484N Changes To

(Members) Share

Holdings

08/09/2017 3 08/09/2017 7E9427173

screenshot.1310

Date: Sept 19, 2017

Source: We Suspect Silence blog and Riverine Protection Permit Exemption Requirements, Version 2.01, 13/11/2019

Subject: CRN made an ‘approved entity’

On September 19, 2017 Carmichael Rail Network Pty Ltd was added as an ‘approved entity’ for the purposes of ‘Riverine Protection Permit Exemption Requirements’. The available documents don’t indicate if Adani Mining Pty Ltd have ever applied for, or been added as an ‘approved entity’.”

https://wesuspectsilence.wordpress.com/2018/10/01/plan-b-separable-portion-1-and-the-new-adani-proponent/

1.03 19/09/2017 Carmichael Rail Network Pty Ltd added as approved entity.

screenshot.1305

https://www.dnrm.qld.gov.au/?a=109113%3apolicy_registry%2friverine-protection-permit-exemption-requirements.pdf

Date: December 12, 2017

Source: Brisbane Times

Subject: NAIF loan veto

“My government provides formal notification to the Commonwealth that financial assistance should not be provided to Adani for the North Galilee Basin Rail Project,” she wrote.

screenshot.1333

DQ08AIKVoAAboao

https://www.brisbanetimes.com.au/politics/queensland/queensland-premier-writes-to-pm-to-veto-1-billion-adani-loan-20171212-p4yxn4.html

Date: March 14, 2018

Source: Whitsunday RC minutes

Subject: Material change of use and approval of lease

12.12018/03/14.09 20170846 – DEVELOPMENT APPLICATION FOR DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE -NON-RESIDENT WORKFORCE ACCOMMODATION (400 BED TEMPORARY CONSTRUCTION CAMP); AND OPERATIONAL WORKS – PETER DELAMOTHE ROAD, COLLINSVILLE, CARMICHAEL RAIL NETWORK PTY LTD

screenshot.1311

and

17.2Confidential Matters – Corporate Services 17.2.22018/03/14.25 APPROVAL OF LEASE CARMICHAEL RAIL NETWORK PTY LTD Moved by:P RAMAGE Seconded by: D CLARK Council resolves subject to the granting of Ministerial Consent under Section 236 (f) Local Government Regulation 2012 award the lease for Lot 87 SP 232119 to Carmichael Rail Network Pty Ltd for an annual lease payment of $250,000 (excluding GST) per annum for a term of two years.

screenshot.1312

https://www.whitsunday.qld.gov.au/DocumentCenter/View/3689

Date: March 27, 2018

Source: Letter from the Coordinator General

Subject: Change of proponent

Adani Mining Pty Ltd (Adani) Is aware that Carmichael Rall Network Pty Ltd as trustee for the

Carmichael Rail Network Trust {CRN) has submitted to your Department an application for

evaluation of environmental effects of proposed change to the North Galilee Basin Rail Project

Coordinator-General’s Evaluation Report on the Environmental Impact Statement (Change

Request 1), .Adani acknowledges and confirms that the proponent for that application Is CRN

and it applies to the NGBR Project.

screenshot.1314

http://services.dip.qld.gov.au/opendata/RTI/released-documents-rtip1819-036.pdf

Date: June 11, 2018

Source: Change of proponent disclosure RTI1819-036-DSDMIP

Subject: Confirmation of proponent details

From: Ece Azman

Sent:

To:

Monday, 11 June 2018 9:03 AM

Sam Redman

Cc: Corinne Templeton

Subject: RE: Two web requests to be updated by Monday

Good morning Sam,

I am happy to confirm that your requested web updates for the Carmichael Coal Mine and Rail Project and the

North Galilee Basin Rail Project have been amended and now live.

screenshot.1315

http://services.dip.qld.gov.au/opendata/RTI/released-documents-rtip1819-036.pdf

Date: December 13, 2018

Source: Lenz Moreton – Revised Adjudication Decision

Subject: AECOM contract

B. REASONS. Background 1. AECOM Australia Pty Ltd (referred to in this adjudication as the “claimant”) was engaged bythe Carmichael Rail Network Pty Ltd (referred to in this adjudication as the “respondent”), to carry out engineering design services relating to the Carmichael Coal Mine and Rail Project involving the: 1. development of the Carmichael Coal Mine; and 2. development of the Carmichael Rail Network, constituting the “work”.

screenshot.1331

https://www.lenzmoreton.com.au/wp-content/uploads/2018/12/181213-Revised-Adjudication-Decision-desktop.pdf

Date: January 11, 2019

Source: Adani Mining Pty Ltd – EPBC Compliance Report North Galilee Basin Rail Project

Subject: Activites undertaken between October 2017 October 2018

Details of activities undertaken during report period

Early works activities undertaken included the

establishment of temporary fencing, clearing and

grubbing, filling and excavation and surveys

including environmental and cultural heritage.

screenshot.1323

Click to access ngbr_project_compliance_report_1_-_epbc_approval_2013_6885.pdf

Date: January 29, 2019

Source: Isaac RC minutes

Subject: CEO to negotiate and execute an interface agreement

11.5 Carmichael Rail Network (CRN) Interface Agreement
EXECUTIVE SUMMARY

On 14 August 2018, Council authorised the Chief Executive Officer to “negotiate and execute an Interface Agreement regarding the CRN rail line interfaces with roads controlled by Council pursuant to section 60(1) of the Local Government Act 2009 (Qld)”. At that time, the draft Interface Agreement provided for two rail-road crossings, namely the proposed CRN rail line interfaces with Bulliwallah Road at Ch 353.654km and Stock Route U401 at Ch 322.100km. Due to the Carmichael Mine and Rail Project reconfiguration and the resultant proposal to maintain the current alignment of Moray Carmichael Boundary Road rather than to construct a realignment of the road, there is a new rail-road interface with Moray Carmichael Boundary Road. This Report provides further background with respect to the new rail-road interface with Moray Carmichael Boundary Road.

Resolution No.: 5838

Moved: Cr Jones Seconded: Cr Bethel

That Council:

1. Extend the Chief Executive Officer’s authorisation to negotiate and execute an Interface Agreement regarding the CRN rail line interfaces with roads controlled by Council pursuant

screenshot.1316

https://www.isaac.qld.gov.au/downloads/file/768/confirmed-minutes—ordinary-meeting—tuesday-29-january-2019

Date: February 26, 2019

Source: Isaac RC minutes

Subject: Authorising negotiations with CRN

11.11 Infrastructure Access Agreement -Adani

EXECUTIVE SUMMARY

Council is requested to note the draft agreement and basis for negotiations with Adani Mining Pty Ltd (Adani) and Carmichael Rail Network (CRN) and to authorise the Chief Executive Officer (CEO) to progress negotiations.

Resolution No.:5894

Moved: Cr Vea VeaSeconded: Cr BethelThat Council:1. Notes the draft Infrastructure Access Agreement. 2. Authorises the Chief Executive Officer to continue negotiations with Adani Mining Pty Ltd and Carmichael Rail Network and report to Council again in March on progress and/or outcomes of negotiations prior to any formal agreement being reached.3. Acknowledge the effort and work from staff involved with getting this draft agreement to this point, in particular the Senior Advisor, former Executive Support Officer, Director Engineering and Infrastructure and Engineering and Infrastructure officers

screenshot.1318

https://www.isaac.qld.gov.au/downloads/file/770/confirmed-minutes—ordinary-meeting—tuesday-26-february-2019

Date: April 29, 2019

Source: Isaac RC minutes

Subject: Confidential deliberations on CRN inetrface agreement

PROCEDURAL MOTION:Resolution No.: 5973Moved: Cr Vea VeaSeconded: Cr LaceyThat Council close the meeting to the public at 12.06pm under Local Government Regulations 2012Section 275 (1) (h) to deliberate on confidential report 11.1 Infrastructure Agreement Update and report 11.2 Carmichael Rail Network Interface Agreement and confidential discussions relating to report 10.1 Division 4 Appointment to Vacancy of Office – Shortlisting of Nominees.

screenshot.1319

And

CONFIDENTIAL REPORT

Closed under s275 (1) (h) other business for which a public discussion would be likely to prejudice the interests of the local government or someone else, or enable a person to gain a financial advantage.11.2Carmichael Rail Network Interface Agreement

EXECUTIVE SUMMARY This report is to provide Council with an overview of the content of the Carmichael Rail Network Interface Agreement for consideration and approval for execution.Resolution No.:5977 Moved: Cr Vea VeaSeconded: Cr JonesThat Council approve the Carmichael Rail Network Interface Agreement and authorise the Chief Executive Officer to execute and vary the Interface Agreement subject to:1. Consistency of the Interface Agreement with the Carmichael Mine Project Infrastructure Agreement; and 2. Satisfactory finalisation of the Interface Risk Management Plan (IRMP) Risk Assessment which is currently with an independent Rail Safety Consultant engaged by Council for review. Carried

screenshot.1320

https://www.isaac.qld.gov.au/downloads/file/775/confirmed-minutes—special-meeting—tuesday-9-april-2019

June 13, 2019

Source: Isaac RC minutes

Subject: Approval of infrastructure agreement with Adani

CONFIDENTIAL REPORT Closed under s275 (1) (h) other business for which a public discussion would be likely to prejudice the interests of the local government or someone else, or enable a person to gain a financial advantage. 11.1Infrastructure Access Agreement Carmichael Mine and Rail Project EXECUTIVE SUMMARY Council is requested to approve the final draft agreement with Adani Mining Pty Ltd (Adani) and Carmichael Rail Network (CRN) and to authorise the Chief Executive Officer (CEO) to execute the Agreement. Resolution No.:6093 Moved: Cr JonesSeconded: Cr LaceyThat Council:1. Approves the final draft Infrastructure Access Agreement with Adani Mining Pty Ltd and Carmichael Rail Network 2. Authorises the Chief Executive Officer to finalise negotiations, execute, administer and vary the agreement to the extent that the variation or cumulative effect of the variations are not material. Carried

screenshot.1330

https://www.isaac.qld.gov.au/downloads/file/2013/confirmed-minutes-special-meeting-thursday-13-june-2019

Date: August 5, 2019

Source: Office of the National Rail Safety Regulator – Accreditations

Subject: Accreditation as a Rail Infrastructure Manager (RIM) 

Carmichael Rail Network Pty Ltd CRN RIM xxxxxxx QLD 1 July 2017 Variation 5 August 2019 Complete

screenshot.1322

https://www.onrsr.com.au/__data/assets/pdf_file/0007/4975/National-Rail-Safety-Register-Accreditation-21Jan20.pdf

Date: October 18, 2019

Source: Adani media release and FAQs

Subject: Martinus contract

MEDIA RELEASE 18 October 2019 Martinus Rail partners with Adani to deliver $100 million rail contractAdani today announced the more than $100 million rail contracthas been awarded to Australian-founded and operated Martinus Rail, with the contract being delivered out of Rockhampton.In a major win for regional Queensland, the contractor will base itself out of Adani’s newly opened Rockhampton Business Centre, ensuring Rockhampton businesses and people will be in prime position to participate in the contract delivery.Adani Mining CEO Mr Lucas Dow said that more than $450million worth of contracts hadalready been awardedon the Carmichael Project, the majority toregional Queensland areas.

screenshot.1327

https://www.adaniaustralia.com/-/media/191018%20-%20Adani%20partners%20with%20Martinus%20Rail

The Carmichael Project was redesigned in 2018 to be a 10 million tonne per annum mine and 200km railway, which will see 1,500 direct jobs and 6,750 indirect jobs created during ramp up and construction.

screenshot.1328

https://www.adaniaustralia.com/-/media/Project/Australia/Fact-sheets/ADI0117—Adani-Mining—Jobs-FAQ-V2.pdf

Date: November 8, 2019

Source: Adani media release

Subject: Decmil contract

Decmil will design and build three 400-bed temporary accommodation camps along the Carmichael Rail Network corridor.

screenshot.1326

https://www.adaniaustralia.com/-/media/191105%20-%20Adani%20partners%20with%20Decmil%20FINAL

Date: December 11, 2019

Source: Adani media release

Subject: Siemens contract

MEDIA RELEASE 11 December 2019

Siemens to deliver safety rail signaling systems for Carmichael Rail Network

After a significant competitive tender process, Siemens has been awarded acontract to deliverrail signaling systemsfor the Carmichael Rail Network.The digital system is designed to keep the trains running safely and efficiently. Siemens core technology helps avoid derailments, which secures aclean environment along the rail line.

screenshot.1324

https://www.adaniaustralia.com/-/media/191211%20-%20Adani%20partners%20with%20Siemens%20FINAL

Advertisement

Briefing: Adani’s Plan B rail corridor

NGBR – EPBC compliant. January 2019

Early works activities undertaken included the establishment of temporary fencing,

clearing and grubbing, filling and excavation and surveys including environmental and

cultural heritage.

Compliance Report: North Galilee Basin Rail Project, EPBC 2013/6885, 13 October 2017
to 12 October 2018

https://www.adaniaustralia.com/-/media/NGBR-Project-compliance-report-1—EPBCapproval-2013-6885.pdf?la=en&hash=DEAA4E559A8C1F60EB7725334F81F7D6

New rail proponent for CCMR and NGBR

My RTI disclosure documents suggest that Qld DSD staff were aware of the change of
proponent at least a day before the CG received the letter from Adani Mining Pty Ltd
confirming the change of proponent for NGBR from Adani Mining Pty Ltd to Carmichael Rail Network Pty Ltd. DSD staff were notified of a meeting titled ‘Adani projects — Implications of proponent name change’ on March 26, 2018 while Adani Mining’s letter to the CG arrived March 27, 2018.

No communications about the change of proponent were made either in Hansard or
ministerial statements. The letter confirming the addition of CRN as joint proponent of the Carmichael mine project was received by the CG on April 23, 2018. The NGBR and CCMR project DSD web pages were updated on June 11, 2018.
http://services.dip.qld.gov.au/opendata/RTI/released-documents-rtip1819-036.pdf

Unresolved legal issues between CRN and AECOM

Adani rejected the ruling of the Queensland Building and Construction Commission.

‘Adjudication 399211: AECOM Australia Pty Ltd v Carmichael Rail Network Pty Ltd, 13

December 2018’

http://xweb.bcipa.qld.gov.au/ars_xweb/Pages/PDFViewer.aspx?APP_NO=00000000399211&SEQ_NO=2
‘Adani refuses to pay for work on Carmichael mine’. Mark Ludlow

https://www.afr.com/news/politics/national/adani-challenging-payments-to-aecom-for-workon-carmichael-mine-20190514-p51n3w

CRN ultimate holding company

Adani changed ultimate holding companies one month after the first hearing in the Senate inquiry into the NAIF.
ASIC documents show that Carmichael Rail Network Pty Ltd changed ultimate holding
companies on September 8, 2017. (retrieved on November 14, 2018).

484 08/09/2017 08/09/2017 3 08/09/2017 7E9427173

484 Change to Company Details

484D Change to Ultimate Holding Company

484N Changes to (Members) Share Holdings

Context and confusion about rail approvals

I reported in my blogpost ‘Plan B, Separable Portion 1 and the new Adani proponent’ that
the rail line for the Carmichael mine is a fusion of 2 separate sections belonging to 2
separate projects. I pointed out that Separable Portion 1 is the remnants of the east-west
narrow gauge line that constituted the rail component of the Carmichael Coal Mine and
Rail Project.

https://wesuspectsilence.wordpress.com/2018/10/01/plan-b-separable-portion-1-and-the-new-adani-proponent/
In April Josh Bavas wrote a piece that suggested that Adani could start digging the mine
without any other rail approvals.

The remaining plans will be required as the project moves through its various stages, just like any other project, but are not needed in order for us to start construction.

‘Adani yet to submit rail plans to Queensland Government’

https://www.abc.net.au/news/2019-04-12/adani-carmichael-mine-rail-plans-not-submittedpremier-says/10995030
On May 31 Margaret Gleeson writing in Green Left Weekly quoted a document hosted on
the Qld DSD website, Carmichael Coal Mine and Rail Project page titled ‘Details of
outstanding approvals’. This document was posted to the DSD web page on May 24,
2019.

‘Details of outstanding approvals’.

https://www.statedevelopment.qld.gov.au/resources/guideline/cg/details-of-outstanding-approvals.pdf
‘Is the Galilee Basin coal ‘bonanza’ a damp squib?’ Margaret Gleeson
https://www.greenleft.org.au/content/galilee-basin-coal-bonanza-damp-squib

Ian Macfarlane puts the NGBR project in perspective

What’s going to happen with the groundwater application and its potential approval is that any further applicants will have not only the infrastructure to get the coal out because the railway line will be there,

https://www.abc.net.au/news/2019-06-12/adani-approval-could-be-galilee-basin-ice-breaker/11194510?fbclid=IwAR3ic3G7DMM89F8qFfRaO-8zlYwKKAC7i-TQoi8gjEsi7o5cZ_omSGXKmV4

Withholding Reach: The Stop Adani coalition has a problem supporting direct action

Today was the first day of the battle to stop Adani building the rail line in the Galilee Basin linking the Carmichael mine to the Abbot Point port. But looking at the social media feeds of Stop Adani coalition partners 350 dot org, GetUp, the Australian Conservation Foundation, and StopAdani dot com, you wouldn’t know there was a marathon 11 hour lock-on in stifling conditions in the Galilee Basin on the rail corridor where Adani and their contractor AECOM have machinery set up for building the rail line.

The reason you wouldn’t know that today’s direct action was happening was because these key partners shared nothing about the protest. No retweeted photos from the direct action organisers Frontline Action on Coal (FLAC) though Bob Brown, Greenpeace Australia Pacific, and the Australian Youth Climate Coalition retweeted photos shared by FLAC.  There was no sharing of stories from the Courier Mail or the Townsville Bulletin, nothing, on Facebook or Twitter, nothing.

Townsville Bulletin: http://www.townsvillebulletin.com.au/news/antiadani-protesters-chain-themselves-to-machinery/news-story/5e318b4362b8f3834048f75856687ff1?nk=edc9bc18ba7fc11278a22ebc3e1bdd60-1508902888

Courier Mail quote:

The protest is in the state development area on the Gregory Highway 35km from the Belyando Roadhouse.

At 8 pm this evening FLAC provided this announcement:

https://www.facebook.com/plugins/post.php?href=https%3A%2F%2Fwww.facebook.com%2FFrontLineActionOnCoal%2Fposts%2F1385041661608720&width=500

At this time, which is about 8.30 pm October 25, 2017, Missy Higgins is trending higher than today’s direct action under the #StopAdani hashtag. Missy Higgins, it was announced about 6 hours into the lock-on, is the latest ambassador for the Stop Adani coalition. Did Missy Higgins make her first action as ambassador the exuberant celebration of the efforts of the 3 activists, 2 of which were arrested? She did not.

I’m not the only one who noticed the absence of allies with reach sharing content from today’s direct action. At about 5 hours into the direct action CounterAct coordinator Nicola Paris (@peacenicsta) tweeted:

it sure is – not much online support from people with big followings – help us boost the call! x

The Galilee Basin Shell Game Continues

Matt Rose from the Australian Conservation Foundation kindly sent me their latest report which was independently prepared by ACIL Allen for submission to the upcoming senate NAIF inquiry.
 
The authors of the report assume that the 1 billion NAIF loan is for the North Galilee Basin Rail Project which is mentioned 19 times. This assumption is not supported by any citations, but in my opinion the assumption is correct.
 
The distance of the proposed rail link corridor is listed by the Australian Marine Conservation Society as 388 kms, the recent television spots by Adani have also listed the distance as 388 kms, and a media statement by Matt Canavan in December last year lists the distance as 388 kms. The following passage in the ACF report prepared by ACIL Allen shows where that 388 km figure comes from.
“The rail link comprises the 78-km Carmichael rail project from the mining and processing operation to Mistake Creek, and the 310-km North Galilee Basin Rail (NGBR) project from Mistake Creek to Abbot Point. The NGBR facility will be accessible by other enterprises. The rail link would have an initial capacity of 40 million tonnes per year and an ultimate designed capacity of 100 million tonnes per year. The cost of the Carmichael and NGBR rail projects is estimated to total of the order of $2.75 billion (based on the $2.2 billion reported cost of the NGBR), and the total cost of the mine, rail and port facilities and other associated infrastructure has been reported to be around $21.7 billion.”
GalileeBasin_coalcomplex_railprojects
This is how it breaks down. The North Galilee Basin Rail Project (NGBR) is 310 kms, you can confirm that distance here. The rail component of the Carmichael Coal Mine and Rail Project (CCMR) must be 78 kms, but the authors don’t provide a source or explanation for this assumption. The whole figure of 388 km represents a fusion of two separate and easily conflated projects. Indeed that was the substance of the explanation offered to me today when I spoke with Matt Rose and asked about the lack of primary sources, and the invisibility of the NGBR to most people.
My question is: Is the CCMR component of the 388 km corridor a part of the NAIF application by Adani?
The North Galilee Basin Rail Project has all the land use agreements it needs, biodiversity offsets have been arranged, and the CEO of Adani Australia is reported to have said that 100 workers will be employed to do geotechnical work on the NGBR over the next 6 months. The Carmichael Mine and Rail Project is another matter entirely. Could it be severable? Could the North Galilee Basin Rail Project get built and begin servicing other north Galilee Basin mines and incentivising the further opening of the Galilee Basin while we are distracted by the Carmichael mine and unnecessary conflations?
For further reading check out my blog post: Compromised Primary Sources and the Galilee Basin Shell Game
Also, check out this report by Mark Kenny in today’s Sydney Morning Herald. It contains not a single reference to the North Galilee Basin Rail Project.

Compromised Primary Sources and the Galilee Basin Shell Game

I went to the State Library of Queensland the other night after speaking with a lawyer from the Environmental Defenders Office Qld. There I used microfiche (for the first time) to scan the article where it was announced to the world that the Northern Australia Infrastructure Facility (NAIF) had given “conditional approval” to a 1 billion loan for North Galilee Basin Rail Project (NGBR). The original article, which appeared on page 15 of the Saturday edition of the Dec 3, 2016 Courier Mail (CM), has all but disappeared from the internet. As the recent NGBR update from EDO Qld states, the media “broadly reported” the news of the NAIF loan. I discussed with the EDO lawyer this aspect of how members of the general public and the media have come to believe, or not be aware, or not believe that the NAIF loan is ‘earmarked’ for the NGBR. The EDO lawyer agreed that the Courier Mail article was a compromised primary source. I went further and argued that the buried nature of the article and it’s absence from the internet made it almost impossible to reference, easy to miss, and very easy to ignore. If the media, activists, and the public are limited from knowledge of a project then they are largely prevented from investigating and analysing the threat posed by that project.
Fast Tracked NGBR
The Courier Mail article buried in page 15 that announced the NAIF-Adani loan to the world
I believe Adani and the state and federal governments are playing a ‘shell game’ with the rail projects in the Galilee Basin. By “shell game” I mean the classic confidence trick with three shells and a pea where distractions and deft movements are used to fleece members of the public. Shell games involve the masking of the most important objective, that the victim should lose track of the position of the pea and a chance at winning. The most important objective – in my reckoning – is ensuring that the North Galilee Basin Rail Project is met with little resistance because it is THE piece of infrastructure that makes the Galilee Basin coal complex possible. This is why I believe that Adani have fused their second rail project, the 189 km east west connection to the existing narrow gauge system in the Bowen Basin, with the coal mine project. By fusing a rail line with the coal mine it creates an appearance that can be readily assumed to be the whole picture. Every time the full name of the Adani mine project is read or written, a rail component is affirmed, and all that is needed to keep a second rail project from interfering with the assumption that the rail project attached to the mine is indeed “the” Adani rail project is to obscure the real rail project, the North Galilee Basin Rail Project.
Shell games require slight of hand. A key component of deception/distraction here is the media and the quality of primary sources. Finding definitive primary sources about the North Galilee Basin Rail Project is extraordinarily difficult. Which is why this buried article which passes on statements made only to the Courier Mail and then telegraphed to the rest of the media is important to understand.
The NGBR update provided on April 18, 2017 by EDO Qld was a response to the information giving requirements of a particular group of clients, most likely environmental NGOs like the Mackay Conservation Group and the Australian Conservation Foundation. It is the first ever statement on the NGBR by EDO Qld. This is significant, EDO Qld provide legal support for their clients, they do not campaign on issues, but rather, they provide legal support for their client’s campaigns.  As such they only publish information in line with the objectives of their clients.
Here’s a link to my crowfunding campaign to disclose a successful RTI request relating to the NGBR from late 2014: https://chuffed.org/project/50920-to-disclose-some-truths-about-adanis-rail-plans

The ‘Notice of Examination’ that could reveal Adani’s dirty dealings in securing the NGBR corridor.

One of the Indigenous Land Use Agreements (ILUAs) that makes the North Galilee Basin Rail Project possible could have been scuppered, or at least had a spot light pointed at it, if Adani hadn’t pulled the sort of scammy behaviour Twiggy Forrest would be proud of. That’s what I believe based on Carol Prior’s testimony from October 2014 and ongoing challenges to the Kyburra Munda Yalga Aboriginal Corporation (KMYAC) the representative body for the Juru native title claim.

Testimony:

“A lot of them didn’t show up and a lot of them don’t know what’s going on,”

“They don’t even know what’s in the ILUA [Indigenous land use agreement] or the auxiliary agreement because in both of them, when I was there around the negotiating table, there’s a confidentiality paragraph in there where you’re not able to talk about it to your family.”

Carol Prior and 4 other KMYAC members won a Notice of Examination on September 30, 2016 from the Office of the Registrar of Indigenous Corporations allowing it to be given full and free access to the corporation’s books. KMYAC were responsible for negotiations involved in the signing of ILUAs with Adani. The 5 KMYAC native title holders have concerns about “financial irregularities” and accountabilities, but they also have concerns about the exclusion of Juru people from negotiations.

Concerns:

“It is our submission that Kyburra has actually received monies from Adani Mining Pty Ltd during 2014-15 in the amount of $1.225 million.

“In addition, a Cultural Heritage Management Plan is in place and Adani transferred $825,000 to Kyburra for cultural heritage survey activities.”

screenshot.118

The Juru ILUA signed with Adani and the Kyburra Munda Yalga Aboriginal Land Corporation was the first of 3 ILUAs making the North Galilee Basin Rail Project possible.

#StopAdani #Keepitintheground #NGBR #ILUA

Key articles:

Native title holders lodge objection to proposed North Galilee Basin rail project

http://www.abc.net.au/news/2014-10-20/native-title-holders-lodge-objection-to-proposed/5826168

Calls for Aboriginal corporation to hand over its books

http://www.townsvillebulletin.com.au/news/calls-for-aboriginal-corporation-to-hand-over-its-books/news-story/e693fce3968570b53931b9bf9810f65f?nk=edc9bc18ba7fc11278a22ebc3e1bdd60-1490768902